Ramora sent a team to Scolmore International Ltd in Tamworth this week, to clean the front of their Head Office.
There have been attempts before to clean the cladding that is constantly being stained by rain water dripping from the roof and leaving unsightly runs down the front of the building. Working from an access platform and using a Dynajet 350 with water temperature set at 130 degrees c we were able to get underneath these water marks and remove the stains.
Being able to work with such high water temperature was important as this enabled us to keep the pressure on the lance down to 110 bar and therefore not cause any damage to the cladding itself.
Thursday, 1 April 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment